Trackage shown is considered the base layout. - Additional trackage is planned within a mountain area yet to be constructed in the far right hand corner of the layout.
Tracks #1 through #6 of the 7 Tracks in the Base Layout are in operation as of September 2007
Photo Menu Next Photo

[  Current Page - TOP  ] [  Menu Play House  ]
 
Copyright © 2007 by E. Ray Smyth